Design, supply, installation works and construction of pedestrian crossings for the reconstruction of the Yalama — Sumgait railway line.
- Sumgait station – 76.5 m.
- Gizilburun - 45.5 m
- Haji Zeynalabdin Taghiyev – 30.8 m.
- Khachmaz - 62.6 m
- Hazi Zeynalabdin Taghiyev2 – 49.1 m.
- Zarat - 41.1 m
- Shabran – 89 m.
- Gilazi - 45.5 m
- Gilgilchay – 34 m.
- Khudat - 58.6 m
- Charhk – 51.4 m.
- Lacat - 41.6 m
- Lick - 63.8 m
- Construction of stair cages and supports of overpasses from reinforced concrete and facade works.
- Production and field installation of the metal structure of the overpass, the crossing part.
- Double painting of metal structure in factory conditions (epoxy and polyurethane).
- Laying and commissioning of electric lines in all crossings after iron-concrete and metal construction works.
- After the construction of the passages, facade works (Aglay, decorative tarsovka, paint) are performed.
- Conducting welding tests during production and checking the strength of bolts after installation in the field.
Tipi
Design, Supply and Installation
Müddət
11.07.2021 - 03.12.2022
Müştəri
Kolin inşaat şirkətinin Azərbaycan Respublikasındakı Nümayəndəliyi